Important Projects

Deepening of the fairway

Description of project

The aim of this project is to increase the fairway draught from the mouth of the port up to the working or manoeuvre circle, with the aim in mind of achieving a level of -12.50 m at maximum equinoctial low tide.

The work involves the dredging of 149,953 m3, the carrying and dumping of the dredged material to the authorised area.

Financing

50% ERDF

Interesting information

Contract awarded to:
DREDGING INTERNATIONAL, N.V.
Contract price:
€4,887,600 (V.A.T. included)
Completion period:
3 weeks
Start date:
viernes, 20 de julio de 2007